Vallès Occidental Waste Treatment Plant in Vacarisses

Environment / Waste management and treatment

Technical assistance during the project, construction and commissioning of the Waste Treatment Center of the Vallès Occidental.

Hired services:

  • Construction project
  • Technical assistance
  • Construction management

Characteristics:

Tratamiento:

  • REST Treatment Capacity: 245.000 t/year
  • FORM treatment capacity: 20.000 t/year (1ª phase) and 40.000 t/year (2ª phase)

Dimensions:

SSector area:

Buily up area:

Pretreatment area:

Stabilization and MOR area:

MOR refination area and warehouse:

Rejection stabilization area:

FORM Area:

Offices and management area:

Inside roads area:

Inside roads area:

82.454 m2

43.316 m2

14.125 m2

11.319 m2

5.905 m2

3.259 m2

5.843 m2

2.865 m2

10.102 m2

29.036 m2

Contracted services:

  • Technical ass. to the executive projection.
  • Technical ass. in the hire of industrials.
  • Technical ass. in project management.
  • Technical ass .in the plant implementation.

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(60) "https://www.en.idp.es/wp-content/uploads//2018/04/A49284.png" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Transport infrastructures
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Industry and logistics
  • array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Installation and energy