Strategic consultancy for the integral management of the urban solid waste in Mexico

Environment / Waste management and treatment

Strategic consultancy to advise, guide and escort cities, the Environment and Natural Resources Secretary (SEMARNAT) and the IADB, at the conformation process of the Operational Organisms for the integrated management of the urban solid waste in Mexico.

Hired services:

  • Technical assistance

Characteristics:

The main goal of this consultancy is to lay the foundations for the conformation of at least five OO’s for the integral management of the urban solid waste in the municipalities of Oaxaca, Veracruz Queretaro, Zacatecas, Baja California, & Mexico DF.

In detail, the scope of the work includes the development of the following activities:

  •  Activity 1: Integration of the juridical, organizational, operational structures and the business plans for the creations of the OO’s for the integral management of the urban solid waste.
  • Activity 2: Exchange workshop of national and international experiences.
  • Activity 3: Escort for the creation and implementation of the OO under the determined model and experiences documentation.
  • Activity 4: Development of an informatics tool for the evaluation of the susceptible municipalities to create an OO for the integral management of the urban solid waste.
If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(60) "https://www.en.idp.es/wp-content/uploads//2018/04/A49284.png" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Transport infrastructures
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Industry and logistics
  • array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Installation and energy