Splitting of the Blanes-Lloret branch of the C32 motorway: Montgat-Blanes (Spain)

Transport infrastructures / Roads

BIM construction project for the splitting of the Blanes – Lloret branch of the C32 motorway for the concession company Abertis.

Hired services:

  • Construction project

Characteristics:

The extension of the C-32 from Tordera to Lloret Mar has two main roads, on the one hand the main road of the C-32 of 6.6 km, and on the other hand the road between the Fanals and Papalús link of 1 km.

Due to the particular characteristics of the area, the two tunnels are mainly highlighted as the main structures of the projected branch. The Túnel dels Tres Turons has a length of 155.80 m between the PKs 2 + 800 – 2 + 955.80. On the other hand, the Túnel de l’Àngel is the most extensive with a length of 335 m between the PKs 5 + 260 – 5 + 595.

In addition, 5 viaducts of lengths between 90 m and 130 m stand out, which make it possible to overcome the orographic difficulties of the terrain. The longest viaduct is in the connection branch between the Fanals and Papalús junction, has a length of 130 m, piles of up to 20 m in height and runs over the stream of Passapera.

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(67) "https://www.en.idp.es/wp-content/uploads//2018/07/MARTORELL-FGC.jpg" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Environment
  • array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Industry and logistics
  • array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Installation and energy