Regulator logistics center Consum ZAL Barcelona

Industry and logistics / Logistics centres

Logistic center regulator of the company Consumo with a total built surface of 50,125 m2 and equipped with 46 automated loading docks

Hired services:

  • Basic project
  • Executive project
  • Construction management

Characteristics:

The new Consum SCV Regulating Logistics Center at the Zona Franca in Barcelona bunches the activity of different centers that where located at the Barcelona metropolitan area, enlarging the capacity and providing more efficiency to its distribution network. The supermarkets cooperative wants to reduce the delivery times and improve the products variety and rotation with this new center.

The design of the buildings allows an agile reception, storage, preparation and expedition process integrating several automatisms.

The platform has been built in three stages that have been stacked in service in a staggered way, so that the following works does not affect the activity development.

Plot surface:

Build surface:

Stage I – Dry (2013)

Stage II – Fish (2014)

Stage III – Meet and fruit (2015)

Urbanized surface:

91.671,39 m2

46.352,70 m2

31.149,41 m2

3.219,92 m2

11.983,67 m2

50.125,92 m2

 

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(57) "https://www.en.idp.es/wp-content/uploads//2018/09/1-8.jpg" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Transport infrastructures
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Environment
  • array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Installation and energy