Potable Water Treatment Plant of Chamisero (Chile)

Environment / Integral water cycle

Potable Water Treatment Plant Chamisero to supply a 1m3/s caudal

Hired services:

  • Construction project
  • Construction management

Characteristics:

The Potable water treatment plant of Chamisero, with a cost of execution of 21 milion €, is projected to supply of potable water (1000 L/s) to the zones of Chicureo and Chamisero (zones with cover of Manquehue waters in the commune of Hill).

The treatment plant has the following processes:

  • Capture work in Canal Batuco.
  • Preliminary stage:
    • Screening (coarse and fine).
    • Addition of lime and sodium hypochlorite (prechlorination).
    • Raw Water (PEAC) and desanding plant.
  • Primary stage:
    • Gutter Parshall (Measurement of flow and addition of coagulant, Polymer anionic, cationic or non-ionic and activated carbon)
    • Rapid mixing chamber and addition of chloride or ferric sulfate.
    • Distribution Chamber.
    • Predecantación.
  • Secondary stage:
    • Parshall Gutter (addition of chloride or ferric sulphate), potassium permanganate and sodium hypochlorite for oxidation.
    • Rapid mixing chamber and addition of polymers.
    • High-rate decantation.
  • Filtration.
  • Disinfection (Bactericidal hypochlorite) and addition of fluorine.
  • Dosage rooms and chemical warehouses.
  • Administration building, control room and water quality sampling.
  • Extraction, dehydration and sludge disposal system:
    • Sludge equalization Pond and equalized sludge-lifting plant.
    • Delivery camera.
    • Thickeners of sludge and hoisting plant of thickened sludge.
    • Pond of sludge accumulation and lift plant to centrifuges.
    • Dehydration and sludge disposal building.

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(60) "https://www.en.idp.es/wp-content/uploads//2018/04/A49284.png" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Transport infrastructures
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Industry and logistics
  • array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Installation and energy