Logistics distribution center of Semark in Santander

Industry and logistics / Logistics centres

Logistic warehouse for storage and distribution of merchandise and corporate offices for Semark – Lupa, in the municipality of Marina de Cudeyo in Santander.

Hired services:

  • Basic project
  • Executive project
  • Construction management

Characteristics:

The new logistics distribution center of Semark – Lupa Supermercados in Santander is built on a plot of 82,990 m2. It has a constructed area of 46,837 m2 and consists of three platforms and corporate offices.

Dry platform:

Dry Platform:

Attic:

Facilities/Loaders/Warehouse:

Vertical circulation building:

Runway:

17.879,87m2

674,21 m2

1.159,22 m2

44,63 m2

42,30 m2

Refrigerated platform and corporate offices:

Refrigerated Platform:

Attic:

Reverse logistics:

Corporate Offices:

14.106,52 m2

370,80 m2

2.990,66 m2

3.009,91 m2

Frozen platform:

Frozen Platform:

Dry Expansion:

2.350,44 m2

4.209,09 m2

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(57) "https://www.en.idp.es/wp-content/uploads//2018/09/1-8.jpg" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Transport infrastructures
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Environment
  • array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Installation and energy