Ethylene pipeline with a length of 1.500 meters at the Can Margarit industrial sector

Installation and energy / Electrical and mechanical installations

Project for the reposition of a section of the existing ethylene pipeline at the industrial sector of Can Margarit in the municipality of Sant Esteve Sesrovires.

Hired services:

  • Construction project
  • Construction management

Characteristics:

Section change at the existing existing ethylene pipeline at the industrial sector of Can Margarit with an approximate length of 905,45 m that will be substituted by a new section of 1.568,23 m with the following characteristics:

  • The maximum pressure for the service will be: 00 kg/cm2 (98,07 bar)
  • Transport temperature of 40ºC
  • Replaced section length L = 1.568,23 m
  • The pipe will be of 6 5/8“(168,3 mm) in steel with high limit carbon, fabricated following the API 5L specification and with a X-42 quality grade.
  • The selected material has the following mechanic characteristics:
    • Minimum specific elasticity: 289 M Pa
    • Breaking load: 413 MPa
  • The selected thickness is 7,1 mm which matches to the thickness calculation applying the Barlow formula with a safety coefficient of 0,4 and a unity welding coefficient.

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(72) "https://www.en.idp.es/wp-content/uploads//2018/07/AEROPUERTO-DENVER3.jpg" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Transport infrastructures
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Environment
  • array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Industry and logistics