Environmental Complex of Waste Management and Treatment of Gipuzkoa (Spain) - (phase 2) - IDP - engineering · environment · architecture

Environmental Complex of Waste Management and Treatment of Gipuzkoa (Spain) – (phase 2)

Environment / Waste management and treatment

Gipuzkoa Environmental Complex integrated by a waste biomethanation plant and a slag treatment plant.

Hired services:

  • Basic project
  • Executive project

Characteristics

Environmental Complex of Gipuzkoa (phase 2), which in turn is specified in the following main facilities:
o Bio-waste biomethanization plant for the anaerobic degradation of the bio-waste fraction collected selectively, sized for a design capacity of 40,000 t / year, and with the possibility of expansion by 20,000 t / year depending on future needs and of the technological evolution.
o Slag Recycling Plant that consists of the treatment and maturation of the slag generated in the Environmental Complex of Gipuzkoa (phase 1) of 52,000 t / year of design capacity.

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(57) "https://www.en.idp.es/wp-content/uploads//2018/10/4-2.jpg" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Transport infrastructures
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Industry and logistics
  • array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Installation and energy