Comprehensive Refurbishment of the Mataró Port

Transport infrastructures / Ports and airport

A comprehensive refurbishment of the Mataró leisure harbour by applying environmental sustainability criteria

Hired services:

  • Construction project
  • Construction management

Characteristics:

He scope of action corresponds to the area surrounding the new Hotel Atenea and is bordered to the northwest by the esplanade road, to the southeast by the Ribera wharf, to the northeast by the port commercial area and to the southeast by the current technical zone inside Mataró Port in the municipality of Mataró.

The solution consists of providing a quality environment for the future central gateway at the Mataró Port towards the city centre which will be an extension of the Ronda Barceló as well as boost the presence of the Hotel Atenea and its operations within the port area allowing service and maintenance vehicles access to the port.

Plus, it will give continuity to the esplanade affected by the Hotel works so as to guarantee continuity towards the west of the future pedestrian connection of the esplanade which crosses the port at the Ribera wharf and its connection to the Ronda Barceló, calming and organising the transit area as well as adapting the accessibility of the pedestrian routes.

Sustainability measures will also be implemented to improve the environment, a space will be created to host various social, cultural, recreational and sporting events and the public green space will be expanded.

Finally, the waste collection system and existing drainage system will be improved. All of this will be done with as little interference as possible with the future construction of the underground passageway to extend Ronda Barceló.

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(67) "https://www.en.idp.es/wp-content/uploads//2018/07/coasin-chile1.jpg" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Environment
  • array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Industry and logistics
  • array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Installation and energy