BBraun pharmaceutical plant in Rubí (Spain) - IDP - engineering · environment · architecture

BBraun pharmaceutical plant in Rubí (Spain)

Industry and logistics / Industrial plants

Industrial production center and most important of BBraun Group worldwide where the latest medical technology and pharmaceutical solutions are developed.

Hired services:

  • Basic project
  • Executive project
  • Construction management

Characteristics:

Expansion project of the most important BBraun Group worldwide Industrial production center, where the latest medical technologies for treatment and wound closure are developed and pharmaceutical infusion and irrigation solutions are manufactured as well as parenteral nutrition diets.

The plant has been build with the GMP (good manufacturing practice) maximum requirements, and with the implementation of last generation machinery and the incorporation of automation high levels.

The basement, main and first floors are focused on production spaces and the second floor constitutes the new groups corporate offices.

Build surface:20.731,93 m2
 Basement:1.670,38 m2
 Main floor:7.455,78 m2
 First floor:6.390,00 m2
 Second floor:5.215,77 m2
 Roof:6.390,00 m2

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(67) "https://www.en.idp.es/wp-content/uploads//2019/01/CILZA-ZAM_4-1.gif" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Transport infrastructures
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Environment
  • array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Installation and energy