Ammonium Nitrate Storage and Loading Plant of the Algorta Norte Mine (Chile) - IDP - engineering · environment · architecture

Ammonium Nitrate Storage and Loading Plant of the Algorta Norte Mine (Chile)

Industry and logistics / Industrial plants

Comprehensive modeling project for the facilities of the Denver International Airport Project for the Ammonium Nitrate Storage and Loading Plant located in the Algorta Norte Mining area in the Antofagasta region (Chile).

Hired services:

  • Construction project
  • Construction management

Characteristics:

Detailed engineering, processing, support in the bidding phase and construction management corresponding to the implementation of an Ammonium Nitrate Storage and Loading Plant in the Algorta Norte mining area of Chile for the Maxam company specialized in blasting for the mining sector.

Minera Algorta Norte is a mining company founded in 2007 that specializes in the extraction and production of iodine, with its main site located northwest of Baquedano, in the Antofagasta region, which includes an extraction area of 14,000 hectares. The investment made for Algorta Norte amounts to 140 million dollars, with a production level of 4,000 tons per year.

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(57) "https://www.en.idp.es/wp-content/uploads//2018/09/1-8.jpg" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Transport infrastructures
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Environment
  • array(4) { [0]=> string(78) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-MA-IDP-1900X550-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Facilities and energy