Alt Empordà Waste Treatment Centre – Pedret i Marzà

Environment / Waste management and treatment

Alt Empordà Waste Treatment Center with a treatment capacity of 85,000 t / year of the remaining fraction, of 15,000 t / year organic fraction and 15,000 t / year of bulky ones.

Hired services:

  • Basic project
  • Executive project
  • Construction management

Characteristics:

Treatment:

  • REST Ability fraction: 85.000 t/year
  • FORM Ability fraction 1st phase and 2nd phase: 15.000 t/year (1st phase), 25.000 t/year (2nd Phase)
  • Bulky capacity: 15.000 t/year

Dimensiones:

REST plant total:

FORM plant total:

Bulky plant total:

Other spaces total:

Total area:

14.942,44 m2

9.575,55 m2

1.161,35 m2

3.722,75 m2

46.375,87 m2

 

Contracted services:

  • Preliminary draft.
  • Basic project.
  • Executive project.
  • Health and safety study.

Images:

If you are interested in our services do not hesitate to contact us by mail idp@idp.es

SIMILAR ACtIONS

OTHER AREAS OF ACTION

    array(4) { [0]=> string(60) "https://www.en.idp.es/wp-content/uploads//2018/04/A49284.png" [1]=> int(800) [2]=> int(576) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Transport infrastructures
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/03/transporte-IDP-19003.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Urban Development
  • array(4) { [0]=> string(79) "https://www.en.idp.es/wp-content/uploads//2018/03/edificacio-IDP-1900X550-1.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Building
  • array(4) { [0]=> string(74) "https://www.en.idp.es/wp-content/uploads//2018/04/Areas-EDIFICACION-ok.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Industry and logistics
  • array(4) { [0]=> string(76) "https://www.en.idp.es/wp-content/uploads//2018/03/logistica-IDP-1900x550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) } array(4) { [0]=> string(80) "https://www.en.idp.es/wp-content/uploads//2018/03/instalaciones-IDP-1900X550.jpg" [1]=> int(1900) [2]=> int(550) [3]=> bool(false) }
  • Installation and energy